|
PROBLEMS WITH
OTHER SYSTEMS |
|
REED SYSTEMS,
LTD SOLUTIONS |
| |
|
|
| Labor
intensive - requires constant attention by at least one operator |
|
Fully
automated – loader operator can operate in spare time |
| |
|
|
| Limited
brine production |
|
Reed
Systems makes 8000 gallons in 1.5 hours |
| |
|
|
| Difficult
to remove sediment from brine maker – Flat bottom tank requires
confined work space conformance to clean |
|
Reed
Systems has 3000 gallon settlement vat to collect sediment and a
5000 gallon sloped bottom storage tank that can be flushed clean |
| |
|
|
| Pump and
water supply freeze |
|
Reed
Systems has insulated heated structure to protect equipment and
water service |
| |
|
|
| Requires
installation labor and additional components |
|
Reed
Systems can be operationally installed in 2 days and includes all
circuitry, breaker panel, lights, heat and security for components |
| |
|
|
| Low
production – Slow loading |
|
Reed
Systems had twin 150 GPM pumps for brine making and manifold that
allows truck filling at a rate of 150 GPM |